Educational guides — ProofWindow publishes educational guides on first SOC 2 readiness. Not legal or audit advice. Not a GRC product.

PW-SOC2-016 SOC 2 readiness spoke · Answer buyers

Bridge letters: covering the gap after a report period

TL;DR. A bridge letter (also called a gap letter) is a short letter signed by your own management that covers the time between the end of your SOC 2 report period and today. It states whether anything material changed in your controls during that gap. It is not part of the report, your auditor does not examine or sign it, and it cannot extend the report — it only speaks, in management's voice, about the gap.

Claim ladder Material statements on this page are labeled Verified, Inferred, or Unknown per editorial standards.

Key terms: Type 2, observation window.

By ProofWindow Editorial Published Updated REVIEW-20261116

On this page

What a bridge letter is

A SOC 2 Type 2 report speaks about a defined period — say, January through June. By the time a buyer's review happens in October, three months sit outside the report. Buyers ask for a bridge letter to cover that gap: a letter on your letterhead, signed by an officer or senior manager, addressing the period from the report's end date to the letter's date. The request usually arrives mid-questionnaire, next to the report request itself — it belongs to the same family of while-you-wait artifacts as the week-2 procurement packet.

What it is not

What it typically states

A conventional bridge letter is short. It identifies the report it bridges (type, period, issuing firm), then states — as management's assertion — whether any material changes to the control environment occurred during the gap: changes to the system, to key controls, to subprocessors, or security incidents relevant to the criteria. If changes did occur, it describes them factually. It closes with the signer, their title, and the date. Anything beyond that — marketing claims, forward promises, audit language — weakens it. The letter's credibility comes from being narrow, signed, and consistent with what your next report will show.

How long a gap it can cover

Unknown as a rule: no AICPA standard sets a maximum bridge period, because the letter is not an AICPA artifact. Inferred from common procurement practice: many buyers treat roughly three months past the report period as the comfortable edge for a bridge letter and push back beyond it, asking instead for the in-progress next report or interim evidence. Treat three months as a planning assumption, not a promise — ask your buyer's security team what they accept, and schedule report periods so the gap a bridge must cover stays short by construction.

Getting one without drama

Questions founders ask

Who writes and signs a bridge letter?

Your own management. The service organization drafts and signs it — typically an officer or senior manager with authority over the control environment. The auditor does not write or sign it.

Does a bridge letter extend our SOC 2 report?

No. The report's period and opinion are fixed. The letter is a separate management assertion about the gap after the period; buyers weigh it as such, and it carries less assurance than the report itself.

What if something did change in the gap?

Say so, factually: what changed, when, and what you did about it. A bridge letter that discloses a change and its handling is stronger than a clean letter a buyer later finds to be wrong.

Sources

  1. primary SOC 2 — SOC for Service Organizations: Trust Services Criteria — AICPA & CIMA — Official SOC 2 topic landing; defines SOC 2 as examination of controls relevant to TSC categories.
  2. primary System and Organization Controls: SOC Suite of Services — AICPA & CIMA — SOC suite overview; links TSC download and related description criteria.

Linear path

← Related: CAIQ-Lite and SIG-Lite while SOC 2 is in progress

Next in path: What to send procurement in week 2 →

← SOC 2 readiness hub